Like many countries in Africa, Senegal has historically suffered from a supply and demand imbalance caused by structural under capacity and underinvestment in the sector.

With aging power plants, reliability of the supply is poor, being characterized by extreme voltage variations, load discharges and frequent and long outages.

The World Bank estimates that in an average month Senegalese endure 12 days when there are power outages.  In June 2011, power cuts, some of which lasted as long as 20 hours, sparked violent riots in Dakar and other towns.

Power Sector in Senegal

The electrification rate in Senegal is relatively high compared to surrounding countries with 75% in urban areas and 17% in rural areas, resulting in 45% nationwide.

Following institutional reform in 1998, Senegal's electricity sector was split into three entities: Senelec, the national utility, the Agency for Rural Electrification (Agence Sénégalaise d'Electrification Rurale, ASER) and the Electricity Regulatory Board (Commission de Régulation au Secteur de l'Electricité, CRSE), which regulates the generation, transmission, distribution and sale of electricity.

With an estimated installed capacity of 633 Megawatts, Senegal’s primary source of electricity generation is derived from diesel and gas, with some hydroelectricity supplied from the Manantali Dam in Mali where the generated capacity of 200 Megawatts is shared between Senegal (33%), Mali (52%) and Mauritania (15%).

During the past decade, the Senegalese economy has seen a major crisis in the electricity sector. The worsening situation was marked by record power shortages in 2008 and 2011, with as many as 270 days of load shedding registered in the latter year, which could only be alleviated in 2012 by resorting to the very expensive rental of short-term generation capacity.  In response, the government, in association with the World Bank, has prioritised the refurbishment of existing aging power plants and infrastructure, whilst at the same time seeking private sector investment in the expansion of generating capacity.

The poor quality of electricity supply in Senegal is viewed as a fundamental obstacle to future economic growth. Upgrading infrastructure and getting new capacity online is likely to take considerable time and in the meantime Senegalese should in the short to medium term brace themselves for more of the same power problems.


Share your Views and Experiences

Every reasonable effort is made to ensure that the information provided above is accurate. No guarantees for the accuracy of the information is made and we encourage your input and feedback in the comments section below so we are able to keep the content updated and actual on the ground experiences can be shared with others.

Please Note: We do moderate posts, with moderation being kept to a minimum. For the benefit of all, we would request only sensible, relevant and non-commercial posts - with the avoidance of inappropriate language.

comments powered by Disqus


About us

All mains powered equipment requires a supply which is maintained within certain limits. Too low and the equipment will malfunction, too high and the equipment could be serious damaged. 

In many developed and developing economies, power demand is outstripping supply, giving rise to large voltage swings, surges and brownouts in the supply.

Whatever your national or international power supply requirements, Ashley-Edison can ensure your equipment receives the power it needs to operate efficiently and without interruption.

To learn more about Ashley-Edison and  the power protection solutions we offer please check-out the links below:

Keep Updated

To keep up to date on the latest News
and Views on the state of global
electricity supplies...

Keep Updated with Twitter
This website uses 'cookies' to give you the best, most relevant experience. Using this website means you’re OK with this. You can change which cookies are set at any time - and find out more about them - by following this link, or by clicking the cookie link at the bottom of any page.
This message will close within 20 seconds.

Accept all cookies